Project

HV Projects

  • Maintenance of HV switchgears and protection relays for EMSD Shatin Sewage Treatment Plant

  • Testing of distance protection relays supplied to Huizhou and Foshan in Mainland China.

  • Periodic maintenance & testing of protection relays and transformer for Stanley Earth Station of HK Telecom

  • Testing of 11kV switchgears and protection relays for new CLP substations at Tak Tin and Tin Shui Wai, Investigations and temporary modifications of protection systems at Xian Royal Hotel.

  • Fault investigation and repair of HV swtichgears and subsequent recommendations for HV distribution at Lok On Pai Transshipment Centre of Provisional Airport Authority.

  • Cable jointing, test and commissioning of feeder protection relays for Hong Kong International Airport (Kai Tak).

  • Calibration tests for feeder protection and generator protection relays of different makes at Hermes House and New Mercury House of Hongkong Telecom.

  • 11kV temporary supply installation, testing and commissioning at Braemar Hill Gas Pipeline Construction site, and later fault investigations and repairs.

  • Periodic Tests and maintenance of 11kV system at China Hong Kong City at Tsim Sha Tsui.

  • 11kV cable jointing for circuit reinforcement at Lion Rock Tunnel; including design and supply of cable end boxes.

  • Power system study for Ma On Shan Water Treatment Plant, Testing and commissioning of 400kV protection systems at Black Point Power Station.

  • Modification and testing on 400kV protection systems for Tsz Wan Shan, Tai Wan, Shatin, Lai Chi Kok 400kV substations.

  • Third Party technical support for Stonecutter Island Naval Base.

  • Technical support for HV furnace installation for Chen Hsong Foundry.

  • Testing and commissioning of 11kV switchgears and transformers for Chek Lap Kok International Airport for contracts C532, C320, C321, C372 total more than 30 substations, (during the period we devised a new method for testing Solkor protection system).

  • Training EMSD staff for distribution system at Chek Lap Kok Airport.

  • Periodic inspection and tests for 11kV switchboard at Tai Po Town Gas Plant.

  • Periodic inspection and test for 11kV switchboard at Yiu Lian Dockyards.

  • Projects on installation, testing and commissioning for 11kV switchgears and transformers for Tai Po Water Treatment Works, commissioning and test of personal computer based fault recorders and travelling wave fault locator at CLPP 400kV and primary substations.

  • Testing and commissioning of 3.3kV equipment for West Rail Project.

  • Testing and commissioning of 11kV switchboard and transformers for MTR Mei Foo Extension.

  • Terminal No.9 Testing and commissioning on 11kV switchboards and transformers.

  • CLPP YME400kV and TKE 400kV Protection test and commissioning.

  • YME11kV protection T&C, CLPP Power Quality Project.

  • CLPP Fault Recorder Term subcontract. T&C for 11kV switchboard at Hung Hum Bay Substation.

  • T&C for 11kV switchboard at Mai Po Substation.

  • HV Cable Installation and Test for Route 8.

  • T&C for 11kV Switchboard at Rout 8 South Substation.

  • T&C for 33kV Substation and switchgears at KTT Station of MTR.

  • T&C for CEM 66kV/11kV Venetian Substation.

  • T&C for City of Dream 66kV / 11kV Substation.

  • T &C for CEM 66kV Venetian Parcel 5 & 6 substation.

  • T&C for Venetian Parcel 5 & 6 for Client Side 66kV / 11kV Substation.

  • T&C and design revisions for CEM Norte 66kV / 11kV Substation modifications and diversions.